How Line 7 works

The page lists Hospital del Henares first and Pitis last, and it has a separate interval table for the MetroEste section. The page marks Estadio Metropolitano as a train-change station. Line 7 crosses Line 5 at Pueblo Nuevo, Lines 4, 6 and 9 at Avenida de América, Line 10 at Gregorio Marañón, Line 2 at Canal and the Circular (Line 6) at Guzmán el Bueno.

Stations in order and transfers

The order below is the one on the Metro de Madrid line page, as of 12 November 2026, from Hospital del Henares to Pitis. Transfers are the lines and connections shown on that page.

What to see near the stops

Line 7 does not reach the Real Madrid stadium, but a change to Line 10 at Gregorio Marañón does: the Bernabéu stadium tour with entry ticket is the stadium visit to pair with it.

Hours and frequency

The interval table starts at 06:05. From Monday to Friday the interval is 5 to 9 minutes before 07:00, 4.5 to 5.5 minutes between 07:30 and 08:00 and 5.5 to 6.5 minutes through the rest of the day. On Saturdays and Sundays it is 7 to 9 minutes before 07:00 and 7.5 minutes after. The last interval row, 01:30 to 02:00, is 15 minutes every day. MetroEste has its own table on the line page.

Practical tips

  • Match days. The Estadio Metropolitano station is the one to look for on maps and signs, and it is busy around fixtures and concerts.
  • Check the section. The line has a MetroEste section with its own timetable; read the terminus on the platform sign.
  • Avenida de América is a big interchange. Lines 4, 6, 7 and 9 meet there: allow a few minutes.

See the whole network on the Madrid metro map, the Circular, Line 6 and Line 10; plan your days with Madrid in 3 days.

FAQ

How many stations has Line 7? 31.

Which station for the Metropolitano stadium? Estadio Metropolitano.

Which line for the Bernabéu? Line 10, station Santiago Bernabéu; Line 7 connects to it at Gregorio Marañón.

The Madrid Authority editorial team, 12 November 2026